ÇÜRÜKSÜ AKBAŞ PROJECT – AKBAŞ DAM REINFORCEMENT
Administration: DSİ 21. Regional Directorate
Location: 20 km East of Denizli Province
Purpose: Potable Water + Energy+ Irrigation
Body Type: Concrete Covered Rock Fill Dam
Height of Thalvegden: 65.75m
Thalweg level: 860.00 m
Elevation from Base: 75.75 m
Base Elevation: 850.00 m
Crest Elevation: 925,75m
Crest Length: 354,12 m
Total Body Volume: 1.505.602 m³
Reservoir Volume: 27.000.000 m³
Diversion Tunnel Number: 1 piece
Diversion Tunnel Length: 321.01 m
Diversion Tunnel Inner Diameter: 4.00 m
Transmission Tunnel Number: 1 adet
Diversion Tunnel Length: 742.19 m
Transmission Tunnel Inner Diameter: 3.00 m
Spillway Type: Input from Side
Spillway Project Flow Rate: 982 m³/s
Duration of Work: 2013-2014
Location: 20 km East of Denizli Province
Purpose: Potable Water + Energy+ Irrigation
Body Type: Concrete Covered Rock Fill Dam
Height of Thalvegden: 65.75m
Thalweg level: 860.00 m
Elevation from Base: 75.75 m
Base Elevation: 850.00 m
Crest Elevation: 925,75m
Crest Length: 354,12 m
Total Body Volume: 1.505.602 m³
Reservoir Volume: 27.000.000 m³
Diversion Tunnel Number: 1 piece
Diversion Tunnel Length: 321.01 m
Diversion Tunnel Inner Diameter: 4.00 m
Transmission Tunnel Number: 1 adet
Diversion Tunnel Length: 742.19 m
Transmission Tunnel Inner Diameter: 3.00 m
Spillway Type: Input from Side
Spillway Project Flow Rate: 982 m³/s
Duration of Work: 2013-2014