ÇÜRÜKSU AKBAŞ PROJECT – AKBAŞ DAM

Administration: DSİ 21st Regional Directorate
Location:  20Km East of Denizli Province
Purpose: Potable Water + Energy+ Irrigation
Body Type:  Concrete Covered Rock Fill Dam
Height of Thalvegden: 65.75 m
Thalweg level: 860.00 m
Elevation from Base: 75.75 m
Base Elevation: 850.00 m
Crest Elevation: 925.75 m
Crest Length: 354.12 m
Total Body Volume:  1.505.602 m³
Reservoir Volume: 27.000.000 m³
Diversion Tunnel Number:  1 piece
Diversion Tunnel Length:  321.01 m
Diversion Tunnel Inner Diameter: 4.00 m
Transmission Tunnel Number:  1 piece
Diversion Tunnel Length:  742.19 m
Transmission Tunnel Inner Diameter: 3.00 m
Spillway Type: Input from Side
Spillway Project Flow Rate: 982 m³/sn
Duration of Work:  2010/-2013