DENİZLİ BOZKURT EMİRÇAY İNCELER POND AND IRRIGATION CONSTRUCTION

Administration: 21st REGIONAL DIRECTORATE
Location: Denizli Bozkurt Country – İnceler Town
Purpose: Irrigitaion of Agricultural Lands belongs to İnceler Township ve Cumalı Town
Bank – Type 1: Homogeneous Eartfill
Height of Thalvegden: 4.00 m
Thalweg level: 861.00 m
Elevation from Base: 7.00 m
Base Elevation: 858.00 m
Crest Elevation: 865.00 m
Crest Length: 252,56 m
Total Body Volume: 19083,50 m³
Bank – Type 2: Homojen Toprak Dolgu
Height of Thalvegden: 3.40 m
Thalweg level: 861.00 m
Elevation from Base: 6.40 m
Base Elevation: 858.60 m
Crest Elevation: 865.00 m
Crest Length: 282,22 m
Total Body Volume: 16204,00 m³
Bank – Type 3: Homojen Toprak Dolgu
Height of Thalvegden: 1.00 m
Thalweg level: 864.00 m
Elevation from Base: 4.00 m
Base Elevation: 861.00 m
Crest Elevation: 865.00 m
Crest Length: 46,28 m
Total Body Volume: 1057,70 m³
Diversion – Type of Sluice Outlet Cut-and-cover Tunnel: Beton Gömlekli Cebri Boru
Diversion – Length of Sluice Outlet Cut-and-cover Tunnel: 54.00 m
Diameter of Penstock Pipe 500,00mm
Place of Spillway:  Right Bank
Spillway Type: Input from Towards, Uncontrolled
Spillway Project Flow Rate: 3,96 m³/sn
Duration of Work: 2016-2018