SOYLEMEZ DAM CONSTRUCTION
Administration: DSI 8th Regional Directorate
Location: Within The Boundaries of Erzurum Province Köprüköy District, It Is Located on the 89th km of Erzurum – Muş – Varto Highway on the Aras River
Purpose: Along with the project, 39,391 hectares of land will be irrigated and approximately 220,57 GWh energy production will be made
Body Type: SSB Ağırlık+Kemer
Height of Thalvegden: 105.00 m
Thalweg level: 1.733,00 m
Elevation from Base: 113,00 m
Base Elevation: 1.725,00 m
Crest Elevation: 1.838,00 m
Crest Length: 332,70 m
Total Body Volume: 681.075 m³
Diversion Tunnel Number: 2
T1 Diversion Tunnel Length: 361,17m
T2 Diversion Tunnel Length: 332,77m
Diversion Tunnel Inner Diameter: 5,50 m
Spillway Type: Input from Front – Uncontrolled and Step by Step
Spillway Project Flow: 1.412,40 m³/s
Duration of Work: 2018 – 2022
Location: Within The Boundaries of Erzurum Province Köprüköy District, It Is Located on the 89th km of Erzurum – Muş – Varto Highway on the Aras River
Purpose: Along with the project, 39,391 hectares of land will be irrigated and approximately 220,57 GWh energy production will be made
Body Type: SSB Ağırlık+Kemer
Height of Thalvegden: 105.00 m
Thalweg level: 1.733,00 m
Elevation from Base: 113,00 m
Base Elevation: 1.725,00 m
Crest Elevation: 1.838,00 m
Crest Length: 332,70 m
Total Body Volume: 681.075 m³
Diversion Tunnel Number: 2
T1 Diversion Tunnel Length: 361,17m
T2 Diversion Tunnel Length: 332,77m
Diversion Tunnel Inner Diameter: 5,50 m
Spillway Type: Input from Front – Uncontrolled and Step by Step
Spillway Project Flow: 1.412,40 m³/s
Duration of Work: 2018 – 2022