Lütfen seçiminizi yapınız

YOZGAT – UZUNLU DAM COMPLETION CONSTRUCTION

Administration: DSİ 12th Regional Directorate
Location:  Approximately 18 Km Northeast of Boğazlıyan County
Purpose:  Irrigation
Body Type:  Homogeneous Soil Fill Dam
Thalwegden Height:  50 m
Thalweg level: 1132.00 m
Elevation from Base:   61 m
Base Elevation:  1121 m
Crest Elevation:  1182 m
Crest Length: 592.17
Total Body Volume:  4 300 000 m³
Reservoir Volume:  39 0000 000 m³
Diversion Tunnel Number: 1 piece
Diversion Tunnel Length:  419 m
Diversion Tunnel Inner Diameter:  3 m
Spillway Type: Input from Front – Uncontrolled
Spillway Project Flow Rate: 1,291 m³/sn
Duration of Work: 2013/-2014
YOZGAT - UZUNLU BARAJI TAMAMLAMA İNŞAATI YOZGAT - UZUNLU BARAJI TAMAMLAMA İNŞAATI YOZGAT - UZUNLU BARAJI TAMAMLAMA İNŞAATI YOZGAT - UZUNLU BARAJI TAMAMLAMA İNŞAATI