YUKARI EŞEN PROJECT – BOĞALAR SEKI DAM

Administration: DSİ 21. Regional Directorate
Location: 4 Km North of Seki Township
Purpose: Irrigation
Body Type: Clay-Core Rock Fill Dam
Thalwegden Height: 58.00 m
Thalweg level: 1.163,00 m
Elevation from Base: 62.00 m
Base Elevation: 1.159,00 m
Crest Elevation: 1.221,00 m
Crest Length: 337.00 m
Total Body Volume:  1.414.140 m³
Reservoir Volume: 23.300.000 m³
Diversion Tunnel Number: 1 piece
Diversion Tunnel Length: 330.86 m
Diversion Tunnel Inner Diameter: 4.50 m
Spillway Type:: Input from Side
Spillway Project Flow Rate: 1.529,30 m³/s
Duration of Work: 2013-2016