AYDINLAR AKBAŞ DAM SUPPLY CONSTRUCTİON

Administration: DSI 21st Regional Directorate
Place:20 km east of Denizli Province
Purpose:Drinking Water + Energy + Irrigation
Body Type:Concrete-Coated Sand-Gravel Fill Dam
Height from thalweg:65.75m
Talweg Jean:860.00 m
Height from foundation:75.75 m
Foundation Level:850.00 m
Crest Jeans:925.75 m
Crest Length:354.12 m
Total Body Volume:1.505.602 m³
Reservoir Volume:27.000.000 m³
Number of Diversion Tunnels:1 piece
Diversion Tunnel Length321.01 m
Diversion Tunnel Inner Diameter:4.00 m
Number of Transmission Tunnels: 1 piece
Transmission Tunnel Length:742.19 m
Transmission Tunnel Inner Diameter: 3.00 m
Spillway Type: From the Side
Spillway Project Flow: 982 m³/s
Time of work:2010-2013