AYDINLAR AKBAŞ DAM TRANSMİSSİON TUNNEL, WATER INTAKE STRUCTURE AND SLOPE STABİLİTY PROVİSİON WORK

Administration:DSI 21st Regional Directorate
Location: 20 km east of Denizli Province
Purpose Irrigation Water Supply
Body Type: Concrete-Coated Sand – Gravel Filling on the Front Side
Height from thalweg: 65.75 m
Bad from thalweg: 860.00 m
Height from foundation: 75.75 m
Foundation Level: 850.00 m
Crest Jeans: 925.75 m
Crest Length: 354.12 m
Total Body Volume: 1.405.620 m³
Reservoir Volume: 21.800.000 m³
Number of Diversion Tunnels:1 piece
Diversion Tunnel Length: 323.01 m
Diversion Tunnel Inner Diameter: 4.00 m
Spillway Type: From the Side
Spillway Project Flow: 982 m³/s
Time of work: 2015-2017