BURSA GEMLİK – BÜYÜK KUMLA DAM

Administration:DSI 1st Regional Directorate
Place:10 Km Northwest of Gemlik District
Purpose:Drinking water
Body Type: Concrete-Fronted Rock Fill Dam
Height from thalweg:48.00 m
Talweg Jean:20.00 m
Height from foundation:81.00 m
Foundation Level:-13.00
Crest Jeans:70 m
Kret Uzunluğu:385 m
Total Body Volume2.314.580 m³
Reservoir Volume13.500.000 m³
Number of Diversion Tunnels1 piece
Diversion Tunnel Length:287.50 m
Diversion Tunnel Inner Diameter:3.00 m
Spillway Type: Side Take – Uncontrolled
Spillway Project Flow:212.75 m³/sn
Time of work2012-2016