GAZİPAŞA PHASE II PROJECT – GÖKÇELER DAM

Administration:DSI 13th Regional Directorate
Place:13 Km Northeast of Gazipaşa District Center
Purpose: Drinking Water+Energy+Irrigation
Body Type:Concrete-Fronted Rock Fill Dam
Height from thalweg:98 m
Thalves Elevation:102.00 m
Height from Foundation:103 m
Foundation Level:97.00 m
Crest Jeans: 200 m
Crest Length:2.200.000 m³
Total Body Volume:56.830.000 m³
Number of Diversion Tunnels:1 adet
Diversion Tunnel Length:420.91 m
Diversion Tunnel Inner Diameter:4.00 m
Spillway Type:Thick Edged, Counteracting, Uncontrolled Steps
Dolusavak Proje Debisi: 200 m
Spillway Project Flow:592.85 m³/s
Time of work:2011-2014